We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
MINIMIZE WASTE MOTION IN THE PRODUCTION PROCESS LAYOUT.
- Authors
Naufal Paleva, Fenza Gusti; Gusminto, Eka Bambang; Nusbantoro, Ariwan Joko; Dinda Nadia, Fiona Niska; Akbar, Rasyidi Faiz
- Abstract
This study aims to determine the factors that cause waste motion and provide a proposed improvement and improvement design to minimize the factors that cause waste motion in the production process of UD Putera Sroedji Jember. UD Putera Sroedji is a medium-scale company in the field of rice production in the Jember area. The problems found at UD Putera Sroedji are the production flow that is not suitable in general and the distance between departments is quite far. These two things are one of the causes of the company's waste motion. The data was obtained by making observations to observe the flow of the production process as well as measuring distance and time. Data analysis used ARC, ARD and Kaizen methods. The results show that the efficiency level given from the two production process lines, namely the proposed layout will be estimated to be able to reduce the production distance of line 1 along 31.25 meters or more efficiently by 30.65% with time savings of 2.828.75 seconds. 2 along 45.4 m or more efficient by 38.07% with a time saving of 3,980.15 seconds.
- Subjects
AGRICULTURAL wastes; RICE processing; ENERGY consumption; DATA analysis; CONTINUOUS improvement process
- Publication
Airlangga Development Journal, 2023, Vol 7, Issue 2, p134
- ISSN
2528-3642
- Publication type
Article
- DOI
10.20473/adj.v7i2.36677