We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
贵阳至南宁高速铁路引入南宁铁路枢纽方案研究.
- Authors
何德鹏; 周榕洲; 刘盛凯
- Abstract
The Guiyang - Nanning High-speed Railway is an important part of the Baotou ( Yinchuan) to Haikou high corridor of the high-speed railway net in China. This paper analyzed the difficulties and existing problems of Guiyang to Nanning high-speed railway hub, including: various controlled factors and difficult line selection, the insufficient adaptability of the existing passenger stations departure lines, the shortage of vehicles and maintenance capacity of the depot. Aiming the difficulties and existing problems, considering hub plan, city plan, geology condition, passenger transport capacity and vehicle maintenance facility, an optimal layout of the hub was studied. Firstly, five sets of key sections were studied and compared in the existing urban planning, main engineering quantity and engineering geological conditions, and the scheme on the west side of Lanhai expressway was adopted. Secondly, a plan to adjust the division of labor of main passenger stations was proposed to solve the problem of insufficient arrival and departure capacity of existing passenger stations. Finally, the long-tern reinforcement scheme and conditional reservation planning were given to solve the shortage of vehicles and maintenance capacity of existing depot.
- Subjects
GUIYANG (Guizhou Sheng, China); PASSENGER traffic; TRANSPORT vehicles; DIVISION of labor; URBAN planning; PROBLEM solving; TERMINALS (Transportation)
- Publication
Railway Investigation & Surveying, 2023, Vol 49, Issue 3, p76
- ISSN
1672-7479
- Publication type
Article
- DOI
10.19630/j.cnki.tdkc.202208190001