We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
Measuring cash flow and overdraft for fuzzy project networks with overlapping activities.
- Authors
Yu, Min-Chun; Dang, Van-Loi; Yeh, Hui-Chung
- Abstract
Overlapping activities with imprecise durations to accelerate schedules has an impact on scheduling a construction project. The project may need to be rescheduled to suit the available overdraft limitation rather than to adopt the least total cost schedule. However, past research has seldom conducted a risk analysis on the project cash flow and overdraft requirements for projects with overlapping activities in a fuzzy environment. This research uses fuzzy DSM-based scheduling and proposes an algorithm to calculate the cash flow and overdraft at different risk levels. A numerical example is illustrated to demonstrate the algorithm’s effectiveness.
- Subjects
CASH flow; NETWORK analysis (Planning); OVERLAPPING generations model (Economics); ALGORITHMS; OVERDRAFTS
- Publication
Journal of Civil Engineering & Management, 2017, Vol 23, Issue 4, p487
- ISSN
1392-3730
- Publication type
Article
- DOI
10.3846/13923730.2016.1210215