We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
Coordination between Understanding Historic Buildings and BIM Modelling: A 3D-Output Oriented and typological Data Capture Method.
- Authors
Li, K.; Li, S. J.; LIU, Y.; Wang, W.; Wu, C.
- Abstract
At the present, in trend of shifting the old 2D-output oriented survey to a new 3D-output oriented survey based on BIM technology, the corresponding working methods and workflow for data capture, process, representation, etc. have to be changed.Based on case study of two buildings in the Summer Palace of Beijing, and Jiayuguan Pass at the west end of the Great Wall (both World Heritage sites), this paper puts forward a "structure-and-type method" by means of typological method used in archaeology, Revit family system, and the tectonic logic of building to realize a good coordination between understanding of historic buildings and BIM modelling.
- Subjects
HISTORIC buildings; BUILDING information modeling; THREE-dimensional imaging in archaeology
- Publication
International Archives of the Photogrammetry, Remote Sensing & Spatial Information Sciences, 2015, Vol 40, Issue 5/W7, p283
- ISSN
1682-1750
- Publication type
Article
- DOI
10.5194/isprsarchives-XL-5-W7-283-2015