We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
Implementación del RCM II en planta de producción de lingotes de plomo.
- Authors
Barros Chaparro, David Jesús; Valencia Ochoa, Guillermo; Vargas Henríquez, Lisandro
- Abstract
This article presents the application of the concept of RCM II at a factory Bateries in the section for the production of lead ingots. The methodology for the implementation of RCM II involves functional analysis, identification of failure modes (Causes of failures), Effects of Failure (Manifestation of faults), nesting Risk (Criticality), among other steps. Then, to preserve the functions of the system, proactive maintenance tasks are assigned and failure modes identified using RCM Decision Diagram II and under the cost-effective for each failure pattern. As a result of this study was obtained documents for Managing Maintenance (RCM Information Sheet and Decision Sheet Metalworking sectional RCM) RCM Plans (Graphical Relationship between maintenance tasks and equipment proposals analyzed), this pilot RCM revealed also safety conditions and redesign the equipment configuration for improved MTBF. The RCM is part of the tactical level Maintenance Management and has had great success in the modern industry, namely, the aviation industry, mining and manufacturing industry, the energy industry (Oil, hydro, nuclear), among others.
- Publication
Scientia et Technica, 2014, Vol 19, Issue 2, p200
- ISSN
0122-1701
- Publication type
Article