We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
500 kV庆南变接入系统的潮流分析.
- Authors
宋杭选
- Abstract
The heavy load of Daqing - Huoju double - circuit line has last for many years because of the heavy load in Daqing. In recent years, this problem has become the bottleneck which restricts the development of power industry in this area as the integration of wind farms. In order to solve the problem, Heilongjiang Province will put a 500 kV substation into operation in the west of Daqing. Aiming at the change of Daqing brought by the substation, the author simulated the power grid by PSASP, compared the flow distribution before and after the integration, and at the same time proposed the suggestion for future schedule and planning of transmission network.
- Publication
Heilongjiang Electric Power Journal, 2016, Vol 38, Issue 3, p214
- ISSN
2095-6843
- Publication type
Article