We found a match
Your institution may have access to this item. Find your institution then sign in to continue.
- Title
Study on Reconstruction Scheme of Existing Stations of Urban Rail Transit -- Taking the Reconstruction Scheme of Liujiaping Station of Chongqing Rail Transit Line 6 as an Example.
- Authors
ZHOU Hongchang
- Abstract
At present, China's urban rail transit has been developing rapidly and put into network operation in most cities. However, due to the changes and adjustments of urban planning, the extension of existing rail transit lines or their related transfer lines have been adjusted accordingly. In order to meet the operation needs and facilitate the service of passengers, it is necessary to upgrade the existing lines (stations) and only by transformation can they be connected with the subsequent lines to meet the needs of urban development. With reference to Chongqing Rail Transit Line 6 and combined with the latest land and space planning of Chongqing and the operation organization scheme of line 6, comprehensive comparison and selection method is adopted to comprehensively compare and analyze different reconstruction and layout schemes of Liujiaping Station. Finally, the branch line scheme with short reconstruction period, low project investment and short interruption time and without independent operation conditions is selected.
- Subjects
CHONGQING (China); RAILROAD stations; RAILROADS; URBAN planning; URBAN growth; RADIATION trapping; MODEL railroads; PUBLIC spaces
- Publication
Railway Standard Design, 2022, Vol 66, Issue 12, p124
- ISSN
1004-2954
- Publication type
Article
- DOI
10.13238/j.issn.1004-2954.202109250001